COMPANY HEADER
Print Back

The Conversion Kit comes assembled but must be attached and secured to the PaceCart. Assembly to the PaceCart typically takes one person less than 15 minutes and is completed using an Allen-wrench (provided) and a screw gun with 5/16-in. bit (bit also provided). Once the Conversion Kit is installed, contractors can continue to apply OlyBond Adhesives from the five gallon bag-in-box sets.

  • Easy to install and compatible with PaceCart 2B and PaceCart 3 equipment.
  • Typical installation
more
Unit of Measure

Specifications

Manufacturer

OMG

Part No.

OMGCONVERSION